Portfolio

St. Luke’s Episcopal Church

Project Cost: $157,328

Energy savings since 2009: 30%

Expected annual energy savings: $64,562

Major Improvements:

  1. Building automation control of HVAC systems
  2. High-performance lighting & controls, including pilot installations of LED
  3. Installation of low-flow plumbing fixtures and aerators
  4. Recycling, composting & reducing use of non-recyclable materials
Download Case Study

Random Portfolio